Wall Flashing Details Baldwinsville NY

To seal around wall penetrations, use a two-piece metal plate bedded in urethane sealant. Sheathing wrap above the metal plate should lap over the plate while sheathing wrap below it should be slipped beneath.

AJ NYC CONSTRUCTION CORP
(917) 470-0009
2080 EAST 61st ST
Brooklyn, NY
KS Construction and Kitchen Cabinets
(917) 864-2670
19541 Jamaica Avenue
Hollis, NY
HomeExcellence USA
1-888-896-7950
605 Water street
New York, NY
Captain Contracting
(718) 438-1415
3615 15th Avenue
Brooklyn, NY
Centerline Interiors Contracting Incorporated
(212) 679-1733
13 E 37th St
New York, NY
Affordable Homes General Construction LLC
(718) 713-2446
511 Chauncey Street
Brooklyn, NY
X Builders Inc
347-952-1776
9928 62nd drive
Rego Park, NY
911 Restoration
201-646-0055
320 Washington Ave
Hackensack, NY
DB CONSTRUCTION
(347) 365-8284
592 BUSHWICK AVE
Brooklyn, NY
Ace Drywall System Inc
(718) 625-3944
194 Ashland Pl
Brooklyn, NY
Data Provided by:
 

Provided By:

Wall Flashing Details

Source: REPLACEMENT CONTRACTOR Magazine
Publication date: January 1, 2005

By REPLACEMENT CONTRACTOR Staff

Excerpted from JLC Field Guide to Residential Construction, published by JLC Books (JLConline.com), a division of Hanley Wood, LLC.

Gas and Water Lines/Conduit
To seal around wall penetrations, use a two-piece metal plate bedded in urethane sealant. Sheathing wrap above the metal plate should lap over the plate while sheathing wrap below it should be slipped beneath.

Cantilevered Joists/Beams

Cantilevered deck or balcony joists that project through the wall framing are trouble spots. Protect them with a two-part flashing sealed with urethane. The top flashing piece must overlap the bottom one.

Deck Ledger

Ledger flashing needs to be more than a Z-flashing running along the top edge of the ledger board. Use metal coil stock behind the ledger. Make sure the coil stock slips under the sheathing wrap above, and drapes over the sheathing wrap below the ledger.

Electrical Fixtures

Install electrical boxes and lighting fixtures on a hemmed metal flashing plate, as shown above. Do not tape the plate over the sheathing wrap; slit the sheathing wrap above the fixture and slip the plate beneath.